pnpm 11 · Version Status

pnpm 11 End of Life Date

pnpm 11 end-of-life date, support status, and CVE risk. Data reconciled from official vendor documentation and endoflife.date at every build; the source of each date is on the product page.

pnpm 11 is actively supported. EOL date: April 30, 2027.
📅 Get reminded before pnpm 11 reaches EOL on April 30, 2027 — alerts 90, 30 & 7 days out.
Google →
✉️ Or get it by email — alerts at 90 / 60 / 30 / 7 days and on the day: Free · one-click unsubscribe in every email · no other mail, ever
EOL Date
Apr 30, 2027
219 days remaining
Latest Release
11.27.1
Standard release
Release Date
Apr 28, 2026
pnpm 11 series
Lifecycle detail

pnpm 11 was released on April 28, 2026 and support is scheduled to end on April 30, 2027 — a planned supported lifespan of 1 year, shorter than the 2 years median for pnpm releases. Its most recent patch is 11.27.1, published September 20, 2026.

← pnpm 10 All pnpm versions pnpm 12 →
10 / 100
Low Risk
EOL Risk Score™  How is this calculated? →
EOL Recency
0/40
Attack Surface
10/30 Medium tier
CISA KEV Exposure
0/20 Not in KEV
Extended Support
0/10 Available
EOL Risk Score™ — proprietary methodology by endoflife.ai. Factors: EOL recency, attack surface breadth, CISA KEV catalog presence, extended support availability. Updated at every build. Methodology →  ·  View score card →
All pnpm Versions
VersionLatestEOL DateStatus
4 4.14.4 Apr 24, 2021 EOL
5 5.18.11 Apr 29, 2022 EOL
6 6.35.1 Mar 20, 2023 EOL
7 7.33.7 Apr 16, 2024 EOL
8 8.15.9 Apr 30, 2025 EOL
9 9.15.9 Apr 30, 2026 EOL
10 10.34.5 Apr 30, 2027 Active
11 11.27.1 Apr 30, 2027 Active

What does pnpm 11 end of life mean?

When pnpm 11 reaches end of life, the maintainers stop issuing security patches for this version. CVEs discovered after the EOL date are publicly disclosed on the National Vulnerability Database with no patch available. Exploit code frequently appears on GitHub within days of disclosure.

The CVE blind spot: A CVE-based scan does not show the ongoing accumulation of unpatched vulnerabilities in EOL software versions. Some scanners flag unsupported versions of common products, but coverage varies, and none of them give you the date in advance. Running pnpm 11 past its EOL date creates a growing attack surface that a clean scan result does not rule out.

Migrate to pnpm 12 or implement compensating controls — network segmentation, enhanced monitoring, restricted access — while migration is underway.

Frequently Asked Questions
When does pnpm 11 reach end of life?
pnpm 11 reached end of life on April 30, 2027. That is 219 days remaining.
Is pnpm 11 still supported?
Yes, pnpm 11 is currently supported. The EOL date is April 30, 2027.
What should I upgrade to from pnpm 11?
The recommended upgrade from pnpm 11 is pnpm 12 — the latest actively supported version. Check the pnpm full timeline for all supported versions.
What are the security risks of running pnpm 11 past EOL?
When pnpm 11 reaches end of life, the maintainers stop issuing security patches. Any CVEs disclosed after the EOL date accumulate with no vendor fix. A CVE-based scan does not show this — it is the CVE blind spot; some scanners flag unsupported versions of common products, but coverage varies and none give the date in advance. Organizations running EOL pnpm should migrate immediately or implement compensating controls.
Data from endoflife.date API · Generated at build time · How we source data →