Eclipse Temurin 8 · Version Status

Eclipse Temurin 8 End of Life Date

Eclipse Temurin 8 end-of-life date, support status, and CVE risk. Data from endoflife.date and official vendor documentation.

Eclipse Temurin 8 is actively supported. EOL date: December 31, 2030.
📅 Get reminded before Eclipse Temurin 8 reaches EOL on December 31, 2030 — alerts 90, 30 & 7 days out.
Google →
EOL Date
Dec 31, 2030
1605 days remaining
Latest Release
8u502-b07
LTS release
Release Date
Jul 29, 2021
Eclipse Temurin 8 series
Lifecycle detail

Eclipse Temurin 8 was released on July 29, 2021 and support is scheduled to end on December 31, 2030 — a planned supported lifespan of 9 years and 5 months, longer than the 6 years and 3 months median for Eclipse Temurin LTS releases. It is a long-term support (LTS) release, so it carries a longer patch window than the interim releases around it. Its most recent patch is 8u502-b07, published July 31, 2026.

All Eclipse Temurin versions Eclipse Temurin 16 →
10 / 100
Low Risk
EOL Risk Score™  How is this calculated? →
EOL Recency
0/40
Attack Surface
10/30 Medium tier
CISA KEV Exposure
0/20 Not in KEV
Extended Support
0/10 Available
EOL Risk Score™ — proprietary methodology by endoflife.ai. Factors: EOL recency, attack surface breadth, CISA KEV catalog presence, extended support availability. Updated at every build. Methodology →  ·  View score card →
All Eclipse Temurin Versions
VersionLatestEOL DateStatus
8 LTS 8u502-b07 Dec 31, 2030 Active
16 16.0.2+7 Sep 30, 2021 EOL
11 LTS 11.0.32+9 Oct 31, 2027 Active
17 LTS 17.0.20+8 Oct 31, 2027 Active
18 18.0.2.1+1 Sep 30, 2022 EOL
19 19.0.2+7 Mar 31, 2023 EOL
20 20.0.2+9 Sep 19, 2023 EOL
21 LTS 21.0.12+8 Dec 31, 2029 Active

What does Eclipse Temurin 8 end of life mean?

When Eclipse Temurin 8 reaches end of life, the maintainers stop issuing security patches for this version. CVEs discovered after the EOL date are publicly disclosed on the National Vulnerability Database with no patch available. Exploit code frequently appears on GitHub within days of disclosure.

The CVE blind spot: Most vulnerability scanners check for known CVEs but do not flag the ongoing accumulation of unpatched vulnerabilities in EOL software versions. Running Eclipse Temurin 8 past its EOL date creates a permanently growing attack surface that standard security tooling will not surface.

Migrate to Eclipse Temurin 25 or implement compensating controls — network segmentation, enhanced monitoring, restricted access — while migration is underway.

Frequently Asked Questions
When does Eclipse Temurin 8 reach end of life?
Eclipse Temurin 8 reached end of life on December 31, 2030. That is 1605 days remaining.
Is Eclipse Temurin 8 still supported?
Yes, Eclipse Temurin 8 is currently supported. The EOL date is December 31, 2030.
What should I upgrade to from Eclipse Temurin 8?
The recommended upgrade from Eclipse Temurin 8 is Eclipse Temurin 25 — the latest actively supported version. Check the Eclipse Temurin full timeline for all supported versions.
What are the security risks of running Eclipse Temurin 8 past EOL?
When Eclipse Temurin 8 reaches end of life, the maintainers stop issuing security patches. Any CVEs disclosed after the EOL date accumulate with no remediation path. Most vulnerability scanners do not flag this — it is the CVE blind spot. Organizations running EOL Eclipse Temurin should migrate immediately or implement compensating controls.
Data from endoflife.date API · Generated at build time · How we source data →