containerd · Lifecycle Status

containerd End of Life (EOL) Dates & Support Timeline

Complete end-of-life dates, support windows, and security status for all containerd versions. Data from endoflife.date, checked against the vendor's own lifecycle pages where we have read them (share on /accuracy). Updated at every deploy.

⚡ containerd 2.0 reaches end of life in March 2027. Plan your migration now — EOL in March 2027.

containerd 2.4 is supported until May 16, 2027, its end-of-support date. Active support for containerd 2.4 ends on May 15, 2027; security fixes continue until that end-of-life date. The next containerd version to reach end of life is 2.0, in March 2027. 10 of 13 tracked containerd versions are past end of life; the most recent to reach it, 2.2, did so on November 6, 2026. The full containerd lifecycle, with every version's release and end-of-support date, is in the table below.

Running an EOL version? Get matched with support options — free ↓
📅 Get reminded before containerd 2.0 reaches EOL in March 2027 — alerts 90, 30 & 7 days out.
Google → Subscribe to all dates
Subscribe keeps every containerd end date in your calendar and updates itself. Calendar URL: https://endoflife.ai/calendar/containerd.ics
✉️ Or get it by email — alerts at 90 / 60 / 30 / 7 days and on the day: Free · one-click unsubscribe in every email · no other mail, ever
Latest Active
2.4.2
2.4 series
Next EOL
2.0
Mar 2027
Active Versions
2
of 13 total
EOL Versions
10
no longer patched
35 / 100
Medium Risk
EOL Risk Score™  How is this calculated? →
EOL Recency
25/40
Attack Surface
10/30 Medium tier
CISA KEV Exposure
0/20 Not in KEV
Extended Support
0/10 Available
EOL Risk Score™ — proprietary methodology by endoflife.ai. Factors: EOL recency, attack surface breadth, CISA KEV catalog presence, extended support availability. Updated at every build. Methodology →
CPE Identifier
cpe:2.3:a:linuxfoundation:containerd
The Common Platform Enumeration name vulnerability scanners and CVE records use for containerd. Verified against the NIST CPE dictionary. Machine-readable for all products: cpe-map.json
Package URLs (purl)
pkg:golang/github.com/containerd/containerd/v2
pkg:golang/github.com/containerd/containerd
pkg:github/containerd/containerd
The package URL identifiers SBOM tools emit for containerd, so a CycloneDX or SPDX component resolves to this page by exact identifier rather than by name. Machine-readable for all products: purl-map.json; whole-SBOM checks: POST /v1/sbom or the Stack Scanner.
Release Cycle Timeline
■ EOL   ■ Warning   ■ Active   ┊ Today
Release cycle timeline 201820192020202120222023202420252026202720281.01.11.21.31.41.51.61.72.02.12.22.32.4TODAY
10 versions of containerd are past end of life — security patches have stopped. Get matched with support →
All Versions
VersionLatest ReleaseRelease DateEOL DateDaysStatus
1.0 1.0.3 Dec 5, 2017 Dec 5, 2018 2894 days past EOL EOL
1.1 1.1.8 Apr 23, 2018 Oct 23, 2019 2572 days past EOL EOL
1.2 1.2.14 Oct 24, 2018 Oct 15, 2020 2214 days past EOL EOL
1.3 1.3.10 Sep 26, 2019 Mar 4, 2021 2074 days past EOL EOL
1.4 1.4.13 Aug 17, 2020 Mar 3, 2022 1710 days past EOL EOL
1.5 1.5.18 May 3, 2021 Feb 28, 2023 1348 days past EOL EOL
1.6 LTS 1.6.39 Feb 15, 2022 Aug 23, 2025 441 days past EOL EOL
1.7 LTS 1.7.36 Mar 10, 2023 Sep 30, 2026 38 days past EOL EOL
2.0 LTS 2.0.14 Nov 5, 2024 Mar 2027 EOL in March 2027 Warning
2.1 2.1.9 May 7, 2025 Jul 3, 2026 127 days past EOL EOL
2.2 2.2.10 Nov 5, 2025 Nov 6, 2026 1 day past EOL EOL
2.3 LTS 2.3.7 Apr 30, 2026 Apr 30, 2028 540 days remaining Active
2.4 2.4.2 Sep 16, 2026 May 16, 2027 190 days remaining Active
Spotted a date that disagrees with the vendor's own lifecycle page? Report it with the vendor's link → Every correction is published on the accuracy page.
containerd EOL status badge Live EOL badge for your README — updates automatically at every build. [![containerd EOL](https://img.shields.io/endpoint?url=https%3A%2F%2Fendoflife.ai%2Fbadge%2Fcontainerd.json)](https://endoflife.ai/containerd)

containerd release and support pattern

Across the 13 release lines with a published release date, containerd has shipped a new line roughly every 7 months (median interval). A line typically stays supported for about 1.5 years from its release to its end-of-life date. 4 of the 13 tracked lines are designated long-term support, which is where the longer windows sit.

Of the 13 release lines tracked, 10 are past end of life and 3 are still within support. The newest line, 2.4, was released September 16, 2026. The next scheduled end of life is 2.0 in March 2027 (the vendor names the month only). The longest-supported line currently published is 2.3, to April 30, 2028.

Computed from the tracked release data at every build — the figures above are the dates in the table, restated, not an editorial estimate.

What does containerd end of life mean for your organization?

When a version of containerd reaches end of life, the maintainers stop issuing security patches. Vulnerabilities discovered after this date are publicly disclosed on the National Vulnerability Database, exploit code appears on GitHub, and your systems remain permanently exposed.

The CVE blind spot: A CVE-based scan does not show the accumulation of unpatched vulnerabilities in EOL software. Some scanners flag unsupported versions of common products, but coverage varies, and none of them give you the date in advance. With a zero-day, nobody knows about the vulnerability. With EOL software, the vulnerability is public — listed, rated, and often weaponized — but no vendor patch is coming. This is one of the most dangerous gaps in enterprise security posture.

Organizations running EOL containerd should treat it as a vulnerability class in their risk register, apply compensating controls (network segmentation, enhanced monitoring, access restriction), and prioritize migration to a supported version.

Your options when containerd reaches end of life

There are four realistic paths. Which one is right depends far more on how long the system needs to keep running than on the version you are on today.

OptionBest whenWatch out for
Move to a supported version The system will outlive the current version's support window and you can schedule the work Budget for compatibility testing, not just the upgrade itself — that is where the real cost sits
Replace the component The project is unmaintained, or a better-supported alternative exists The replacement has its own lifecycle and its own end-of-life date — you are changing vendors, not escaping the problem
Buy extended support Migration is genuinely underway but cannot finish before the deadline, or the workload is frozen by certification or a third-party application A bridge, not a destination — every year purchased is a year the migration still has to happen
Document accepted risk The system is isolated, short-lived, or scheduled for retirement Only defensible with real compensating controls and a written decision — auditors treat undocumented end-of-life software as a finding

How to choose, in one question: how many more years does this system need to run? Under a year, extended support (where it exists) is usually cheaper than an emergency migration. One to three years, migrate — support purchased repeatedly costs more than doing the project once, and the project only gets harder as the version ages. Indefinitely, migrate now and plan the next migration before it surprises you.

Worth saying plainly, because vendors selling extended support rarely will: extended support is often the more expensive choice over a multi-year horizon. It is the right answer when a deadline is genuinely unreachable, not as a default. Compare the annual fee against the one-time cost of migrating before committing to either.

Formalizing decisions like this across your estate? Our free EOL policy template is a ready-to-adopt policy with risk tiers, remediation SLAs, and audit mapping — no signup, free to use and share.

Extended Support Options

If you cannot migrate immediately, check whether the vendor or a third party sells extended support with security patches for your containerd version; coverage varies by product and version. Where it exists it is a bridge, not a permanent solution — plan your migration in parallel.

endoflife.ai
Get containerd Support Options

containerd has 10 versions past end of life — security patches have stopped, but CVE disclosures haven't. Extended support past the official date exists for many products in this position — whether it exists for containerd is exactly what we check. Tell us where to reach you and we'll reply with matched options and pricing guidance — or an honest "no vendor covers this."

Free · No obligation · Independent — we track the dates, vendors don't pay for placement · Dates verified against vendor sources
Frequently Asked Questions
What is the end-of-life date for containerd?
The next containerd version reaching EOL is 2.0 in March 2027. See the full table above for all version EOL dates.
When is the containerd support end date?
The next containerd support end date is March 2027, when version 2.0 reaches end of support. Each version has its own support end date — see the table above for every version's date.
What is the latest supported version of containerd?
The latest active version of containerd is 2.4.2. Always verify against the table above as support windows can change.
What happens when containerd reaches end of life?
When containerd reaches end of life, the vendor stops issuing security patches. Any CVEs disclosed after the EOL date accumulate with no vendor patch path — a growing attack surface that a CVE-based scan does not show. Some scanners flag unsupported versions of common products, but coverage varies, and none of them give the date in advance.
How do I check if I'm running an EOL version of containerd?
Check your current version against the table above. If your version's EOL date has passed, you are running unsupported software. You can also use the endoflife.ai Stack Scanner to check your entire dependency file at once.
Is there extended support available for EOL containerd versions?
Some vendors offer extended support for EOL software. Contact the original vendor or check with enterprise support providers for options.

Related Products

✓ 18 of 39 lifecycle dates vendor-sourced · confidence: 17 high, 22 medium, 0 low (each version page shows where every date comes from) · provenance · ✓ Cross-checked against official containerd (CNCF) lifecycle documentation (2026-11-01) — includes vendor-published corrections not yet in upstream data · Upstream dataset: endoflife.date API · endoflife.date · Generated at build time · How we source data →
containerd end-of-life status badge