Spring Integration 7.1 · Version Status

Spring Integration 7.1 End of Life Date

Spring Integration 7.1 end-of-life date, support status, and CVE risk. Dates read at the vendor's own lifecycle pages (spring.io); the source of each date is on the product page.

✓ Spring Integration 7.1 is actively supported. EOL date: July 2027.
📅 Get reminded before Spring Integration 7.1 reaches EOL in July 2027 — alerts 90, 30 & 7 days out.
Google →
✉️ Or get it by email — alerts at 90 / 60 / 30 / 7 days and on the day: Free · one-click unsubscribe in every email · no other mail, ever
Automating this check? GET https://api.endoflife.ai/v1/score/spring-integration/7.1 returns this version's end-of-life date, its source and the EOL Risk Score as JSON. Get a free API key (150 requests a day, no expiry).
EOL Date
Jul 2027
EOL in July 2027
Latest Release
7.1.2
Standard release
Release Date
Jun 10, 2026
Spring Integration 7.1 series
Extended Support
Jul 2028
Tanzu Spring commercial support · paid
Where these dates come from
End of lifeJul 2027Vendor's own page, read by our adapter · spring.io · checked Nov 18, 2026high · 2 sources agree
End of extended supportJul 2028Vendor's own page, read by our adapter · spring.io · checked Nov 18, 2026high · 2 sources agree
ReleaseJun 10, 2026Our catalog, built from the vendor pages · spring.iomedium · 1 source agrees
Confidence: high = two or more independent sources agree (the vendor's page read by our adapter, a person's check against the vendor, the dataset the date came from); medium = one; low = the vendor page disagrees or our last read is stale. How we source dates.
Spotted a date that disagrees with the vendor's own lifecycle page? Report it with the vendor's link → Every correction is published on the accuracy page.
Lifecycle detail

Spring Integration 7.1 was released on June 10, 2026 and support is scheduled to end in July 2027 — a planned supported lifespan of 1 year and 2 months, in line with the 1 year and 1 month median for Spring Integration releases. Its most recent patch is 7.1.2, published October 22, 2026.

← Spring Integration 7.0 All Spring Integration versions
10 / 100
Low Risk
EOL Risk Score™  How is this calculated? →
EOL Recency
0/40
Attack Surface
10/30 Medium tier
CISA KEV Exposure
0/20 Not in KEV
Extended Support
0/10 Available
EOL Risk Score™ — proprietary methodology by endoflife.ai. Factors: EOL recency, attack surface breadth, CISA KEV catalog presence, extended support availability. Updated at every build. Methodology →  ·  View score card →
All Spring Integration Versions
VersionLatestEOL DateStatus
4.3 4.3.24 Aug 2019 EOL
5.0 5.0.14 Mar 2019 EOL
5.1 5.1.13 Oct 2019 EOL
5.2 5.2.11 Oct 2020 EOL
5.3 5.3.10 May 2021 EOL
5.4 5.4.13 Nov 2021 EOL
5.5 5.5.20 Jun 2023 EOL
6.0 6.0.9 Dec 2023 EOL

What does Spring Integration 7.1 end of life mean?

When Spring Integration 7.1 reaches end of life, the maintainers stop issuing security patches for this version except under Tanzu Spring commercial support (paid), until Jul 2028. CVEs discovered after the EOL date are publicly disclosed on the National Vulnerability Database with no patch available. Exploit code frequently appears on GitHub within days of disclosure.

The CVE blind spot: A CVE-based scan does not show the ongoing accumulation of unpatched vulnerabilities in EOL software versions. Some scanners flag unsupported versions of common products, but coverage varies, and none of them give you the date in advance. Running Spring Integration 7.1 past its EOL date creates a growing attack surface that a clean scan result does not rule out.

Migrate to Spring Integration 7.1 or implement compensating controls — network segmentation, enhanced monitoring, restricted access — while migration is underway.

Frequently Asked Questions
When does Spring Integration 7.1 reach end of life?
Spring Integration 7.1 reaches end of life in July 2027. The vendor publishes the month only, not a day.
Is Spring Integration 7.1 still supported?
Yes, Spring Integration 7.1 is currently supported. The EOL date is July 2027.
What should I upgrade to from Spring Integration 7.1?
The recommended upgrade from Spring Integration 7.1 is Spring Integration 7.1 — the latest actively supported version. Check the Spring Integration full timeline for all supported versions.
What are the security risks of running Spring Integration 7.1 past EOL?
When Spring Integration 7.1 reaches end of life, the maintainers stop issuing security patches except under Tanzu Spring commercial support (paid), until Jul 2028. Any CVEs disclosed after the EOL date accumulate with no vendor fix. A CVE-based scan does not show this — it is the CVE blind spot; some scanners flag unsupported versions of common products, but coverage varies and none give the date in advance. Organizations running EOL Spring Integration should migrate immediately or implement compensating controls.
Data from the vendor's own lifecycle pages (spring.io) · Generated at build time · How we source data →