Progress LoadMaster LMOS 7.2.54.x (LTSF branch) · Version Status

Progress LoadMaster LMOS 7.2.54.x (LTSF branch) End of Life Date

Progress LoadMaster LMOS 7.2.54.x (LTSF branch) end-of-life date, support status, and CVE risk. Dates read at the vendor's own lifecycle pages (kemptechnologies.com); the source of each date is on the product page.

✓ Progress LoadMaster LMOS 7.2.54.x (LTSF branch) is actively supported. No end-of-life date has been announced yet.
EOL Date
TBD
Supported
Latest Release
7.2.54.19
Standard release
Release Date
—
Progress LoadMaster LMOS 7.2.54.x (LTSF branch) series
Lifecycle detail

Its most recent patch is 7.2.54.19, published July 27, 2026.

← Progress LoadMaster LMOS 7.2.63.x (GA branch) All Progress LoadMaster versions Progress LoadMaster LMOS 7.2.48.x (LTS branch) →
10 / 100
Low Risk
EOL Risk Score™  How is this calculated? →
EOL Recency
0/40
Attack Surface
10/30 Medium tier
CISA KEV Exposure
0/20 Not in KEV
Extended Support
0/10 Available
EOL Risk Score™ — proprietary methodology by endoflife.ai. Factors: EOL recency, attack surface breadth, CISA KEV catalog presence, extended support availability. Updated at every build. Methodology →  ·  View score card →
All Progress LoadMaster Versions
VersionLatestEOL DateStatus
VLM — Supported EOL
VLM-Exchange — Supported EOL
VLM-DR — Supported EOL
VLM-100 — Supported EOL
VLM-1000 — Supported EOL
VLM-2000 — EOL Active
VLM-10G — Feb 1, 2025 EOL
VLM-5000 — Feb 1, 2025 EOL

What does Progress LoadMaster LMOS 7.2.54.x (LTSF branch) end of life mean?

When Progress LoadMaster LMOS 7.2.54.x (LTSF branch) reaches end of life, the maintainers stop issuing security patches for this version. CVEs discovered after the EOL date are publicly disclosed on the National Vulnerability Database with no patch available. Exploit code frequently appears on GitHub within days of disclosure.

The CVE blind spot: A CVE-based scan does not show the ongoing accumulation of unpatched vulnerabilities in EOL software versions. Some scanners flag unsupported versions of common products, but coverage varies, and none of them give you the date in advance. Running Progress LoadMaster LMOS 7.2.54.x (LTSF branch) past its EOL date creates a growing attack surface that a clean scan result does not rule out.

Migrate to Progress LoadMaster LMOS 7.2.63.x (GA branch) or implement compensating controls — network segmentation, enhanced monitoring, restricted access — while migration is underway.

Frequently Asked Questions
When does Progress LoadMaster LMOS 7.2.54.x (LTSF branch) reach end of life?
Progress LoadMaster LMOS 7.2.54.x (LTSF branch) has no announced end-of-life date yet — it is currently supported, with EOL to be determined.
Is Progress LoadMaster LMOS 7.2.54.x (LTSF branch) still supported?
Yes, Progress LoadMaster LMOS 7.2.54.x (LTSF branch) is currently supported. The EOL date is TBD.
What should I upgrade to from Progress LoadMaster LMOS 7.2.54.x (LTSF branch)?
The recommended upgrade from Progress LoadMaster LMOS 7.2.54.x (LTSF branch) is Progress LoadMaster LMOS 7.2.63.x (GA branch) — the latest actively supported version. Check the Progress LoadMaster full timeline for all supported versions.
What are the security risks of running Progress LoadMaster LMOS 7.2.54.x (LTSF branch) past EOL?
When Progress LoadMaster LMOS 7.2.54.x (LTSF branch) reaches end of life, the maintainers stop issuing security patches. Any CVEs disclosed after the EOL date accumulate with no vendor fix. A CVE-based scan does not show this — it is the CVE blind spot; some scanners flag unsupported versions of common products, but coverage varies and none give the date in advance. Organizations running EOL Progress LoadMaster should migrate immediately or implement compensating controls.
Data from the vendor's own lifecycle pages (kemptechnologies.com) · Generated at build time · How we source data →