Zerto 10.8 End of Life Date
Zerto 10.8 end-of-life date, support status, and CVE risk. Data from endoflife.date and official vendor documentation.
Zerto 10.8 was released on October 28, 2025 and support is scheduled to end on October 28, 2027 — a planned supported lifespan of 2 years, in line with the 2 years and 1 month median for Zerto releases.
What does Zerto 10.8 end of life mean?
When Zerto 10.8 reaches end of life, the maintainers stop issuing security patches for this version. CVEs discovered after the EOL date are publicly disclosed on the National Vulnerability Database with no patch available. Exploit code frequently appears on GitHub within days of disclosure.
The CVE blind spot: Most vulnerability scanners check for known CVEs but do not flag the ongoing accumulation of unpatched vulnerabilities in EOL software versions. Running Zerto 10.8 past its EOL date creates a permanently growing attack surface that standard security tooling will not surface.
Migrate to Zerto 10.9 or implement compensating controls — network segmentation, enhanced monitoring, restricted access — while migration is underway.