Azul Zulu 9 · Version Status

Azul Zulu 9 End of Life Date

Azul Zulu 9 end-of-life date, support status, and CVE risk. Data from endoflife.date and official vendor documentation.

Azul Zulu 9 is past end of life. This version no longer receives security patches. 2961 days past EOL — migrate to a supported version immediately.
EOL Date
Mar 31, 2018
2961 days past EOL
Latest Release
9.0.7.1
Standard release
Release Date
Sep 21, 2017
Azul Zulu 9 series
← Azul Zulu 8 All Azul Zulu versions Azul Zulu 10 →
Recommended upgrade path
Azul Zulu 25
Latest release: 25.32.21 · EOL: Sep 30, 2033
View full Azul Zulu timeline →
All Azul Zulu Versions
VersionLatestEOL DateStatus
7 LTS 7.56 Jul 31, 2022 EOL
6 LTS N/A Dec 31, 2018 EOL
8 LTS 8.92.0.21 Dec 31, 2030 Active
9 9.0.7.1 Mar 31, 2018 EOL
10 10.3.5 Sep 30, 2018 EOL
11 LTS 11.86.21 Jan 31, 2032 Active
12 12.3.11 Sep 30, 2019 EOL
13 13.54.17 Mar 31, 2023 EOL

What does Azul Zulu 9 end of life mean?

When Azul Zulu 9 reaches end of life, the maintainers stop issuing security patches for this version. CVEs discovered after the EOL date are publicly disclosed on the National Vulnerability Database with no patch available. Exploit code frequently appears on GitHub within days of disclosure.

The CVE blind spot: Most vulnerability scanners check for known CVEs but do not flag the ongoing accumulation of unpatched vulnerabilities in EOL software versions. Running Azul Zulu 9 past its EOL date creates a permanently growing attack surface that standard security tooling will not surface.

Migrate to Azul Zulu 25 or implement compensating controls — network segmentation, enhanced monitoring, restricted access — while migration is underway.

Frequently Asked Questions
When does Azul Zulu 9 reach end of life?
Azul Zulu 9 reached end of life on March 31, 2018. This version is no longer receiving security patches.
Is Azul Zulu 9 still supported?
No. Azul Zulu 9 reached end of life on March 31, 2018 and is no longer receiving security patches.
What should I upgrade to from Azul Zulu 9?
The recommended upgrade from Azul Zulu 9 is Azul Zulu 25 — the latest actively supported version. Check the Azul Zulu full timeline for all supported versions.
What are the security risks of running Azul Zulu 9 past EOL?
When Azul Zulu 9 reaches end of life, the maintainers stop issuing security patches. Any CVEs disclosed after the EOL date accumulate with no remediation path. Most vulnerability scanners do not flag this — it is the CVE blind spot. Organizations running EOL Azul Zulu should migrate immediately or implement compensating controls.
Data from endoflife.date API · Generated at build time · How we source data →