endoflife.ai
EOL Checker Products EOL Watch Get Support

Nutanix AOS 6.10 End of Life Is October 31, 2026 — the Last LTS Exits, and Its Maintenance Already Ended in January

Published: August 11, 2026  ·  EOL Watch — deadline coverage  ·  Dates verified against our tracked lifecycle data (verification pass 2026-08-11). Nutanix's own EOL portal page sits behind a support login and does not render for us, so lifecycle definitions here follow the Nutanix support model as documented by endoflife.date, which sources Nutanix's published support policies — methodology

In 81 days, on October 31, 2026, Nutanix AOS 6.10 reaches End of Support Life. If your calendar has that as the date to plan around, it is missing the more important one: AOS 6.10's End of Maintenance was January 31, 2026. The release has not received regular bug-fix maintenance for over six months. What it has had since January is Nutanix's tail phase — troubleshooting support with security fixes only — and October 31 is the day that ends too. After it, a cluster on 6.10 runs an operating system that will never change again: no security fixes, no bug fixes, no one to call.

That two-date structure is not a Nutanix quirk — it is fast becoming the standard shape of enterprise lifecycles, and it is the shape most planning spreadsheets get wrong. We documented the same pattern on FortiOS 7.2 (critical-fixes-only for sixteen months before its September 30 End of Support) and OpenShift 4.18 (maintenance ends August 25, with continued patches gated behind an EUS entitlement). The single "EOL date" a dashboard shows is usually the second cliff. By the time it arrives, the first one — the end of routine patching — is long past.

What October 31, 2026 actually changes: AOS 6.10 passed End of Maintenance on January 31, 2026 — the end of active maintenance with bug and security fixes, roughly 15 months after its October 7, 2024 release. Since then it has been in the roughly 9-month troubleshooting phase: security fixes only, plus support for diagnosing problems. October 31, 2026 is End of Support Life — the end of that phase, and of everything: no further fixes at any severity, and no troubleshooting support. There is no published extended-support tier beyond it.

The two-clock reality: 6.10's patch flow already narrowed in January

Per the support model our data tracks, each AOS release is actively maintained with bug and security fixes for roughly 15 months, followed by roughly 9 more months of troubleshooting support carrying security fixes only. Those are the two clocks: End of Maintenance stops the routine patch flow; End of Support Life stops everything. (Nutanix publishes the authoritative per-version table on its support portal's EOL page, which requires a customer login — our tracked AOS lifecycle data mirrors those dates in the open.)

AOS 6.10 has tracked the model exactly: released October 7, 2024, End of Maintenance January 31, 2026, End of Support Life October 31, 2026. The tail phase has been real but thin — our data shows the last 6.10 build to date, 6.10.1.14, shipped February 11, 2026, just after the maintenance cutoff, consistent with security-only updates continuing into the troubleshooting window. So the question "is 6.10 still supported?" has had a narrower answer than most inventories show since January: it is supported for security fixes and troubleshooting, not maintained. In 81 days it will be neither.

Why the distinction carries more weight here than on most products: AOS is not one application in a stack — it is the layer the whole stack stands on. A Nutanix node runs storage, compute and virtualization management as one converged platform; the distributed storage fabric that every VM's disk lives on is AOS. When the patch flow to that layer stops, there is no compensating control sitting underneath it, and "we'll isolate the unpatched box" is not available advice when the box is the infrastructure. For completeness: there is no Nutanix entry in CISA's Known Exploited Vulnerabilities catalog as of August 11, 2026 — we checked the live catalog before publishing. The stakes here are structural, not an active fire.

Running Nutanix AOS past end of life?
Extended support past the official EOL date exists for many products in this position — whether it covers Nutanix AOS is exactly what we check. Tell us where to reach you and we’ll reply with matched options and pricing guidance — or an honest “no vendor covers this.” Free, no obligation.

Free · No obligation · Independent — we track the dates, vendors don’t pay for placement · dates verified against vendor sources. See all support options →

6.10 is the last LTS — the 7.x train is a different lifestyle

In our tracked data, AOS 6.10 carries the LTS flag — and it is the last release that does. Nutanix historically ran a two-track model: long-lived LTS releases (5.5, 5.10, 5.15, 5.20, 6.5, 6.10 in our dataset) for teams that wanted to park, and short-term releases in between for teams that wanted features. Per the release-model note documented alongside our upstream data, that split ended with AOS 7.0: Nutanix moved from the LTS/STS designations to a unified release model in which every release gets the same window — the roughly 15 + 9 months described above — and major or minor releases arrive every 6 to 9 months.

The honest way to read the data is that the LTS tier was already winding down before it ended. AOS 6.5, the previous LTS, lived roughly 35 months from release to End of Support Life (July 2022 to June 2025). AOS 6.10 gets roughly 25 (October 2024 to October 2026) — barely more than the unified-model releases that replaced the tier. But the planning consequence of the new model is real and worth stating plainly: on the 7.x train there is no release you can park on. The longest runway any AOS release now gets is about two years from its own GA, and staying inside the maintained window — the phase with bug fixes, not just security fixes — means upgrading roughly once a year. Teams that chose 6.10 precisely because it was the LTS should treat this migration as a cadence change, not just a version change.

Where to land: 7.0 and 7.3 are short piers, 7.5 and 7.6 are targets

Four 7.x releases have published dates, and two of them are effectively ruled out by their own clocks:

AOS 7.0 — ruled out. Its maintenance ended March 31, 2026, and its End of Support Life is December 31, 2026 — two months after 6.10's. Migrating to it would be a move from one expiring release to another.

AOS 7.3 — technically alive, practically short. Its End of Support Life is June 30, 2027, but its maintenance ends September 30, 2026 — seven weeks from this article's publication, and a month before 6.10 is even end of life. A migration landing on 7.3 arrives in the troubleshooting phase almost immediately.

AOS 7.5 — the conservative target. Released December 8, 2025, in the field for eight months with current patch builds (latest tracked: 7.5.1.10, July 28, 2026). Maintained to March 31, 2027, End of Support Life December 31, 2027. Choosing it buys a proven release at the cost of facing the next upgrade decision within about a year.

AOS 7.6 — the longest runway. Released July 27, 2026 — two weeks ago. Maintained to October 31, 2027, End of Support Life July 31, 2028, the furthest date currently published for any AOS release. The trade is the usual one for a fresh release: maximum runway, minimum field history. For a migration completing in September or October, validating 7.6 in a non-production cluster first — with 7.5 as the fallback landing — is the path the dates themselves suggest.

Whichever target you pick, plan the hop before the deadline compresses it: AOS upgrades are sequential through supported paths, and the last weeks before an End of Support Life date are the worst time to discover your hardware generation or hypervisor pairing needs an intermediate step. Nutanix's upgrade planning tooling on the support portal maps valid paths per cluster; the point of this article is the calendar, and the calendar says start now.

The post-Broadcom wrinkle: the refuge has a lifecycle too

A meaningful share of the clusters affected by this date exist because of a different vendor's licensing decisions. Since Broadcom's acquisition of VMware ended perpetual licensing and repackaged vSphere into subscription bundles, Nutanix has been the destination most often named for full-scale enterprise exits — the complete HCI-plus-hypervisor alternative, with AHV removing the ESXi dependency entirely. We track the lanes those migrations leave from: every ESXi and vSphere support date in the Broadcom era, the Horizon lifecycle under Omnissa, and — for the open-source exit lane — Proxmox VE 8's August 31 end of life, its first deadline most VMware refugees have ever faced.

AOS 6.10 is the Nutanix edition of the same lesson. An organization that left VMware in 2024 or 2025 and standardized on the then-current LTS — 6.10 — now faces its first Nutanix lifecycle event, on a cadence rhythm entirely unlike the one it left. vSphere majors historically lived the better part of a decade; an AOS release now lives about two years, with the maintained phase closer to fifteen months. Neither model is wrong, but they demand different operating muscles: the VMware muscle was the big once-a-cycle migration project; the Nutanix muscle is a standing annual upgrade practice. Teams that ported the old muscle to the new platform are exactly the ones for whom October 31 will arrive as a surprise — and lifecycle attention in this lane is scarce enough that many will first hear the date from their support renewal, not their monitoring.

Every Nutanix AOS version's dates

All dates from our tracked Nutanix AOS lifecycle data, current as of the verification pass on August 11, 2026. "End of Maintenance" ends active maintenance with bug and security fixes; "End of Support Life" ends the subsequent troubleshooting-and-security-fixes phase — and everything else. Each version links to its lifecycle page with live status and risk score.

VersionStatusReleasedEnd of MaintenanceEnd of Support Life (EOL)
AOS 7.6SupportedJul 27, 2026Oct 31, 2027Jul 31, 2028
AOS 7.5SupportedDec 8, 2025Mar 31, 2027Dec 31, 2027
AOS 7.3SupportedJun 24, 2025Sep 30, 2026Jun 30, 2027
AOS 7.0WarningDec 4, 2024Mar 31, 2026Dec 31, 2026
AOS 6.10 (LTS)WarningOct 7, 2024Jan 31, 2026Oct 31, 2026
AOS 6.8EOLMay 15, 2024May 31, 2025Aug 31, 2025
AOS 6.7EOLAug 28, 2023May 31, 2024Aug 31, 2024
AOS 6.6EOLJan 23, 2023Aug 31, 2023Nov 30, 2023
AOS 6.5 (LTS)EOLJul 25, 2022Oct 31, 2024Jun 30, 2025
AOS 6.1EOLFeb 24, 2022Jul 31, 2022Oct 31, 2022
AOS 6.0EOLJun 14, 2021Feb 28, 2022May 31, 2022
AOS 5.20 (LTS)EOLMay 17, 2021Oct 31, 2022Jul 31, 2023
AOS 5.19EOLDec 16, 2020May 31, 2021Aug 31, 2021
AOS 5.18EOLAug 25, 2020Dec 31, 2020Mar 31, 2021
AOS 5.17EOLMay 1, 2020Aug 31, 2020Nov 30, 2020
AOS 5.16EOLJan 6, 2020May 31, 2020Aug 31, 2020
AOS 5.15 (LTS)EOLMar 31, 2020Aug 31, 2021May 31, 2022
AOS 5.11EOLAug 5, 2019Jan 31, 2020Apr 30, 2020
AOS 5.10 (LTS)EOLNov 26, 2018Jun 30, 2020Apr 30, 2021
AOS 5.9EOLOct 4, 2018Jan 31, 2019Apr 30, 2019
AOS 5.8EOLJul 3, 2018Oct 31, 2018Jan 31, 2019
AOS 5.6EOLApr 16, 2018Jul 31, 2018Oct 31, 2018
AOS 5.5 (LTS)EOLDec 6, 2017Oct 31, 2019Sep 30, 2020

Dates from our tracked dataset (verification pass 2026-08-11), which follows Nutanix's published per-version lifecycle. Nutanix's authoritative EOL table lives on its support portal behind a customer login, so we could not fetch it directly for this article; the support-model description (15 months of maintenance, then 9 months of troubleshooting with security fixes only) follows the documentation maintained at endoflife.date/nutanix-aos, which cites Nutanix's support policies. LTS labels are as flagged in that dataset. If your portal shows different dates for your entitlement, the portal wins — tell us and we will chase the discrepancy.

We track Nutanix AOS alongside Nutanix Files, Nutanix Prism and 480+ other products against vendor-verified datescheck any version in seconds, or see what else hits end of life this quarter.

What to do about it

Nutanix AOS currently carries an EOL Risk Score™ of 40/100 — Grade B, moderate risk, recalculated at every site build from EOL recency, attack surface, CISA KEV exposure, and extended-support availability. Per-version scores and dates are on the Nutanix AOS lifecycle page.

The right response comes down to one question: how many more years does this system need to run? Under a year, extended support (where it exists) is usually cheaper than an emergency migration. One to three years, migrate — support fees paid repeatedly cost more than doing the project once. Indefinitely, migrate now and plan the next one before it surprises you. Extended support is often the more expensive choice over a multi-year horizon — a bridge, not a destination.

Frequently Asked Questions

When does Nutanix AOS 6.10 reach end of life?

Nutanix AOS 6.10 reaches End of Support Life on October 31, 2026. That is the second of two dates: its End of Maintenance — the end of regular bug-fix maintenance — already passed on January 31, 2026. Per the support model our data tracks, an AOS release gets roughly 15 months of active maintenance with bug and security fixes, then roughly 9 more months of troubleshooting support with security fixes only. October 31, 2026 ends that final phase: no fixes of any kind and no troubleshooting support after that date.

Is AOS 6.10 still receiving patches right now?

Only in a narrowed sense, and only until October 31, 2026. Since End of Maintenance on January 31, 2026, 6.10 has been in its troubleshooting phase, which carries security fixes but not regular bug-fix maintenance — our tracked data shows the most recent 6.10 build, 6.10.1.14, shipped February 11, 2026, shortly after the maintenance cutoff. After October 31, 2026 the 6.10 line receives nothing at all.

What should I upgrade to from AOS 6.10?

AOS 7.5 or 7.6, based on the published dates. AOS 7.0 is not a target — its maintenance ended March 31, 2026 and it reaches End of Support Life December 31, 2026, two months after 6.10. AOS 7.3 is barely better: its maintenance ends September 30, 2026, before 6.10 itself is even end of life, with End of Support Life June 30, 2027. AOS 7.5 (released December 8, 2025) is maintained to March 31, 2027 with End of Support Life December 31, 2027, and AOS 7.6 (released July 27, 2026) is maintained to October 31, 2027 with End of Support Life July 31, 2028 — the longest runway currently published.

Is AOS 6.10 the last Nutanix LTS release?

Yes, per our tracked data: 6.10 is the newest AOS release flagged LTS, and no 7.x release carries the flag. With AOS 7.0, Nutanix moved from the LTS/STS split to a unified release model in which every release gets the same support window — roughly 15 months of maintenance plus 9 months of troubleshooting support, with major or minor releases arriving every 6 to 9 months. Leaving 6.10 therefore also means leaving the park-on-an-LTS upgrade strategy: on the 7.x train, staying supported means upgrading roughly once a year.

Related

The Monthly EOL Digest™

Once a month — critical EOL dates, CVE blind spots, and lifecycle changes worth knowing.

© 2026 endoflife.ai · How we verify our dates · API · About · Data from endoflife.date (MIT)